Forex glossary

Portfolio Risk

Portfolio risk concerns the combined result of all exposures, including sizes, directions and relationships between instruments. Adding planned stop losses gives a scenario, not a guaranteed loss bound. Shared currency factors, gaps and changing correlations can hurt several positions simultaneously.

Illustrative example

How does it work in practice?

A hypothetical portfolio has three positions, each with a planned 100 PLN stop loss. Their scenario total is 300 PLN; a common price gap and worse fills can produce a larger loss.

A case to work through

Two different budgets

Model: equity is 12,000 USD; positions have planned losses of 120 and 180 USD.

  1. The scenario total is 300 USD.
  2. 300/12,000 = 2.5% of equity, even though the first position budgets 1%.

What follows? Assess the combined plan before adding a position.

Example boundary: This addition model excludes correlation, gaps and slippage.

Adding scenario budgets

Adding scenario budgetsThis plan total models neither correlation, gaps nor maximum loss.1First positionPlanned loss 120 USD.2Second positionPlanned loss 180 USD.3Combined300/12,000 = 2.5% of equity.
This plan total models neither correlation, gaps nor maximum loss.
Text description of the diagram
  1. First position: Planned loss 120 USD.
  2. Second position: Planned loss 180 USD.
  3. Combined: 300/12,000 = 2.5% of equity.

A useful distinction

Portfolio Risk / 1% Rule

The 1% rule can apply to one trade; portfolio risk concerns the combined exposures.

Change an assumption, see the result

What changes if…?

Add two loss budgets and compare them with equity; this models neither dependence nor maximum loss.

We add two planned losses in the same currency. This is not a correlation model, VaR or a maximum portfolio loss. Costs, gaps and changing relationships between positions may increase the actual loss.

Model inputs

The slider offers a quick range from 0.00 to 1 000.00. Enter a wider range or finer values in the number field.

Total planned losses (USD)250.00
Total relative to equity (%)2.50

Check your understanding

Express the combined loss budget as a percentage of equity.

Equity is 8,000 USD; planned losses are 80 and 160 USD. What is their combined percentage?

Show the answer and explanation

3%

(80 + 160)/8,000 = 3%.

From position budgets to portfolios

Step 7 / 11 · 0 / 11 reviewed

View the full sequence →

Progress is saved only in this browser.

Sources and documentation

The example illustrates the mechanism. Check current account conditions and instrument specifications with the provider.

Read this term in Polish →

This definition is unclear — send feedback

Feedback goes to the editorial team. Do not include account details, personal data or contact information.

← Back to the glossary